Job description
Data Protection: Allied Command Operations (ACO) and its sub-entities, including Joint Force Command Naples, comply with ACO Directive 15-
26 dated 30 July 2021 and subsequent modifications on Data Protection. All personal data the participant will submit, also through ACO e-bid
portal, shall be processed and stored in accordance with such reference and solely in connection with the bidding process and internal and/or
external auditing procedures. The participant may, on written request, address any questions of clarifications regarding the processing of personal
data to ACO/SHAPE Data Protection Office at aco.dpo@shape.nato.int located in Casteau, Mons (Belgium).
NATO UNCLASSIFIED
RFQ-JFCNP-26-15
10 September 2026
| HEADQUARTERS ALLIED JOINT FORCE COMMAND NAPLESQUARTIER GENERAL DU COMMANDEMENT INTERALLIE DEFORCES INTERARMEES NAPLESVia Madonna del Pantano, 80014 Giugliano in Campania, Loc.Lago Patria, Naples, Italy |
| Our Ref: JFCNP/FINDIR(J8)/P&C/HQ/26-116Date: 10 September 2026 | Tel: +39 081-721-5304NCN: 433 - 5304 |
REFERENCE: BI-Strategic Command Directive 060-070 dated 30 June 2015.
Dear Madam or Sir,
HQ Allied Joint Force Command Naples has a requirement for the provision of for IKM DevOPs Data Infrastructure Engineer support.
You are invited to submit a quotation where:
A. The deadlines are:
Online Bidders’ Conference 16 September 2026 at 10:30 hours local time (Italy)
Request for clarification 24 September at 11:00 hours local time (Italy)
Bid closing date 01 October at 11:00 hours local time (Italy)
Quote validity 90 days from the date of Bid closing date
Expected contract starting date 01 January 2027
B. The bidding documents are:
Part I: Bid Instructions
Part II: General Contractual Provision, as applicable
Part III: Statement of Work
Part IV: Price Proposal
and the reference, which will be posted on the ACO Procurement Opportunities Website at the link:
https://shape.nato.int/financeandacquisition/formal-biddings
Read carefully the instructions as stated in the attached bidding documents. Your attention is drawn to Part I, Bidding Instructions, which specifies the procedures to be followed when submitting your quote. Failure to comply with them may cause your quote to be rejected.
An online mandatory Bidder's Conference is scheduled on 16 September 2026 at 10:30 local time (local time).
You are advised that JFC Naples reserves the right to cancel this RFQ at any time in its entirety and bears no liability for the proposal preparation costs incurred, if cancellation occurs.
If you will not participate in this tender, please let us know the reason(s).
Sincerely,
[Original signed]
Alessandro NARBONE
NIC ITA
Senior Contracting Officer
NATO UNCLASSIFIED
HEADQUARTERS ALLIED JOINT FORCE COMMAND NAPLES
QUARTIER GENERAL DU COMMANDEMENT INTERALLIE DE
FORCES INTERARMEES NAPLES
Via Madonna del Pantano, 80014 Giugliano in Campania, Loc.
Lago Patria, Naples, Italy
NATO UNCLASSIFIED
Page 1 of 5
RFQ-JFCNP-26-15
10 Sep 2026
| PART IBID INSTRUCTION |
Operational Service Support for JFCNP IKM DevOps - Data Infrastructure Engineer
1) GENERAL
1. The scope of this Request for Quote (RFQ) is to award a firm fixed-price exclusive contract for
the provision of IKM DevOPs Data Infrastructure Engineer support, in accordance with the
specifications set out in Part III, Statement of Work (SOW).
2. All Bidders must carefully read the Contractual Terms and Conditions that will become integral
parts of the contract awarded under this RFQ. In the event of conflict between the Contractual
Terms and Conditions and the Technical Specifications, the Contractual Terms and Conditions
take precedence.
3. Partial bidding is NOT authorised.
4. Subcontracting is NOT authorised.
5. In accordance with the NATO Bi-SC Procurement Directive, the bid opening is not public.
2) ELIGIBLE
1. Eligible sources are restricted to Commercial entities (1) that originate and are
chartered/incorporated within NATO-member nations, (2) that maintain a professionally active
facility (office, commercial activity, shop, laboratory, etc.) within NATO-member nations and (3)
that have the business resources to support the aforementioned requirements (4) that hold a
valid National Security Clearance.
2. At the time of bidding, prospective Bidders must be legally authorized to provide these kinds of
services in any of the above-mentioned countries and comply with the following minimum
requirement:
a. Having attended the mandatory online Bidder’s Conference.
3. At the time of bidding, Bidders must submit certificate of Security Clearance (NOSI for Italian
companies) to perform work in NATO Military Installations and incorporated in any of the NATOmember nations (due to the urgency of the requirement, at the time of the bidding potential
bidders shall already have a valid security clearance, and as such temporary authorization are
not allowed).
a. The winning contractor must submit the definitive Security Clearance for the Company
(NOSI for Italian companies)
b. The winning contractor must submit a proper Security Clearance (NOS for Italian
companies) also for the personnel who will fulfil the services in such areas where it is
required.
c. The level of Security clearance for the personnel is NATO SECRET.
NATO UNCLASSIFIED
NATO UNCLASSIFIED
Page 2 of 5
RFQ-JFCNP-26-15
10 Sep 2026
NOTE: Non-Italian companies shall provide their National Security Clearances.
3) AMENDMENT OR CANCELLATION OF RFQ
1. JFC Naples reserves the right to amend or delete any one or more of the terms, conditions or
provisions of the RFQ prior to the date set for the bid closing. An amendment or cancellation to
this solicitation will announce such action.
2. JFC Naples reserves the right to cancel, at any time, this solicitation partially or in its entirety. No
legal liability on the part of JFC Naples for payment of any sort shall arise and in no event will a
cause of action lie with any Bidder for the recovery of any costs incurred in connection with
preparing or submitting a bid in response hereto. All effort initiated or undertaken by the Bidder
shall be done considering and accepting this fact. If this solicitation is cancelled prior to the bid
opening, the bids already received shall be erased if electronically submitted or, if submitted in
hard-copy, returned un–opened to the senders upon their request and at the Bidder’s expense
4) DURATION OF THE CONTRACT
1. The Contract awarded through this RFQ will be effective from the date of signature by the Parties
and it will be in force for one (1) base period of one (1) year, (or as determined at time of
award), with the possibility for up to two (2), one-year extension options.
2. Option can only be exercised by JFC Naples upon verification that service has been provided
satisfactorily by the JFCNP Contracting Officer Technical Representative (COTR).
3. Both parties have the right to terminate the contract for convenience, upon written notification, to
be delivered ninety (30) working days prior to the contract expiration date.
4. The Contracting Officer (CO) will provide notice of termination or extension in writing before the
expiration date of the Agreement or subsequent extensions (if any).
5. The contract effective date will be considered the day in which the Engineers receive NATO
accounts.
5) BID CONTENTS
The bid package shall be submitted via email only, consisting of two separate folders (see below):
• Administrative and Technical Bid
• Price Proposal Bid Format.
Each part shall be structured in detachable sections or files, wherein information is grouped per subject, to obtain separate elements for easy evaluation.
Please label all files exactly with the same description (starting with the alphabetical letter) as shown below.
5.1 The Administrative/Technical Bid shall consist of the following:
Required for submission:
a. Presentation of the company. Bidders shall submit a company presentation describing
the company history and core business and the sectors in which the company is
specialized. Summary of work performed that directly relates to the requirement,
specifying dates, contract information and names of clients
b. Compliance Statement/Self Declaration (Enclosure 1)
c. Official National Security Clearance documentation for the Company (NOSI) and for the
employees (NOS). Non-Italian companies shall provide their National Security
Clearances.
d. ISO/IEC 27001:2022 certification (or equivalent)
NATO UNCLASSIFIED
NATO UNCLASSIFIED
Page 3 of 5
RFQ-JFCNP-26-15
10 Sep 2026
e. Curriculum vitae of the one (1) employee (Engineer) appointed to deliver the service
identified at Part III, Statement of Work.
f. Copies of academic credentials, diplomas, and/or other relevant educational certificates
as required in par. 8.3 of the SOW.
g. Evidence of a minimum of 5 years of relevant experience.
5.2 The Price Proposal Bid Format shall consist of the following document:
a. The Price Bid shall be submitted on the attached Part IV Price Proposal.
b. The basic presentation must not change.
c. Prices shall be quoted in EURO.
6) BID SUBMISSION
1. The entire bid shall be written in English, but the official documentation could remain in
NATO-member nation language. In case the Bid provided is in a language other than
English the Bidder will be disqualified as Administrative non-compliant.
2. The Bid Package shall be forwarded via e-mail not later than the Bid Closing Date and time
scheduled to the following appointed personnel:
Name: Mr. Alessandro NARBONE, Contracting Officer (CO)
Email address: alessandro.narbone@nato.int
And to:
Name: Mr. Federico CASCELLA, Contract Administrator (CA)
Email address: federico.cascella@nato.int
3. The Bid package shall be submitted and subdivided into two separate zipped folders described
below:
FOLDER n.1 ‘Admin and Technical’ (as per para 5.1):
Administrative and technical documents
FOLDER n.2 ‘Pricing’ (as per para 5.2):
The Price Proposal Bid Format must be submitted only in the Pricing Section
NOTE: No pricing information shall be submitted in the ‘Technical Section’.
7) BID CLOSING DATE
Bids must be submitted via email no later than 01 October 2026 at 11:00 hours local time (Italy) or the authorized extension thereof. At that date and time, the bidding shall be closed. Late bids will not be accepted.
8) BID VALIDITY
Bids submitted shall remain valid for a period of a ninety (90) calendar days counting from the Bid Closing Date. JFC Naples reserves the right to request an extension of validity if a decision cannot be made within this time. Bidder will be entitled to either grant or deny this extension of validity. JFC Naples will automatically consider a denial as a withdrawal of the bid.
9) BID EVALUATION
1. The evaluation of bids and the determination as to the responsiveness and technical compliance
of the services, products and services offered shall be the responsibility of JFC Naples and shall
NATO UNCLASSIFIED
NATO UNCLASSIFIED
Page 4 of 5
RFQ-JFCNP-26-15
10 Sep 2026
be based on information provided by the Bidders. JFC Naples is not responsible for seeking any
information that is not easily identified and available in the bid package.
2. The bid will be awarded to the lowest price, administrative and technically compliant Bidder. The
following factors will be anyway taken into consideration for the evaluation of the Bidders:
a. Technical compliance with bidding, technical provisions/ specifications/required performance
criteria.
b. Administrative compliance with bidding administrative requirements.
c. Capability of the Bidder to perform and complete the services.
d. Timeliness of delivery offered (due to the urgency of the requirement, the service should start
as soon as possible).
e. Price criteria (best price tender).
10) ONLINE BIDDERS’ CONFERENCE
1. To fully understand the requirement, Bidders are requested to attend the mandatory online
Bidders' Conference schedule on 16 September 2026, at 10:30 hours local time (Italy).
2. To participate, it is requested to provide the Contract Administrator with the email address and
personal information of the attendees (max 2 per company) no later than 15 September 2026 at
15:00 hours local time (Italy). You will then receive the Microsoft Teams invitation link to join the
online Bidders' Conference.
11) BIDDERS REQUEST FOR CLARIFICATION
1. Prospective Bidders should seek clarification as soon as possible. Any explanation desired by a
Bidder regarding the meaning or interpretation of this RFQ, clauses, specifications etc., must be
requested in writing via e-mail only to the CO alessandro.narbone@nato.int and to the CA
federico.cascella@nato.int no later than 24 September 2026 at 11:00 hours local time (Italy)
after participating to the Online Bidder’s Conference.
3. Information given to a prospective Bidder will be furnished to all prospective Bidders, as an
amendment to this solicitation, only if such information is necessary to Bidders in submitting
offers or if the lack of such information would be prejudicial to other Bidders.
4. No verbal explanations or instructions will be given unless approved by the CO.
12) RIGHT OF DISPUTE
Simplified procurement is an informal competitive process aimed at accelerating low value procurement and to remove complexity to encourage participation whilst accelerating delivery.
In deciding to provide a quotation, the potential vendor agrees that the Purchaser’s assessment of the bids is not subject to dispute or to any claim for monetary compensation. All concerns about perceived irregularities in the determination of the winning quotation shall be immediately brought to the attention of the Purchasing and Contracting Officer conducting the solicitation no later than two (2) working days2 from notification of the outcome of the solicitation.
Every effort will be made to address reasonable concerns however the final determination is a unilateral right of the Procurement Authority at the (insert name of originating entity) and will be communicated to the Bidder within three (3) working days from the time of receipt of the concern.
NATO UNCLASSIFIED
NATO UNCLASSIFIED
Page 5 of 5
RFQ-JFCNP-26-15
10 Sep 2026
Enclosure 1
(To be completed and enclosed with your bid)
COMPLIANCE STATEMENT
1. It is hereby stated that we have received RFQ-JFCNP-26-15 on (date) ......................................
and we are going to offer our best rates.
2. Our bid in response to the referred solicitation is fully compliant with the provisions of the RFQ
and the intended contract with the following exception(s):
Clause Description of Deviation
………….. ……………………………………………………………………………………………………….
………….. ……………………………………………………………………………………………………….
(if necessary, add another page)
SELF DECLARATION
3. It is hereby declared that our Company:
a. is currently registered in the Chamber of Commerce, has no insolvency proceeding and is
free of any legal limitations on its rights, that is to say that it is not in receivership, or subject to
deed of management or bankrupt; (or equivalent as per National law for non-Italian companies)
b. is up to date with the payment of social security contributions (DURC for Italian company)
and with the payment of taxes and do not have any pending tax end/or disputes, payments and
issues (DURF for Italian company); (or equivalent as per National law for non-Italian companies)
c. is fully compliant with health and safety legislation law (Lgs Decree 81/2008 for Italian
company); (or equivalent as per National law for non-Italian companies)
d. has not having any pending criminal record and/or charges against business owner
and/or partners and is not blacklisted by any Government Agency for any fraudulent practices;
e. For Italian companies only: has no grounds for banning, forfeiting, or suspending the
signatory under Antimafia Certification (Lgs. Decree 159/2011, Lgs. Decree 218/2012).
4. All the above declarations shall be documented with certificates as per National law, in case of
selected for the award.
5. I am well aware of the fact that furnishing of any false information/fabricated documents would
lead to rejection of my tender at any stage besides liabilities towards prosecution under
appropriate law.
| Date…………………………... | Stamp and Signature of Legal Representative………………………………………………………………...…………. |
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 1 of 21
NATO UNCLASSIFIED
10 September 2026
RFQ-JFCNP-26-15
PROVISION OF IKM DevOPs Data Infrastructure Engineer support.
AT
JFC NAPLES
PART II
GENERAL CONTRACTUAL
PROVISIONS
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 2 of 21
NATO UNCLASSIFIED
10 September 2026
TABLE OF CONTENTS
60-70.1 – CONTRACT ADMINISTRATION SECTION 4
60-70.101 DEFINITIONS......................................................................................................... 4
60-70.102 AUTHORITY........................................................................................................... 5
60-70.103 ORDER OF PRECEDENCE................................................................................... 5
60-70.104 APPLICABLE LAW................................................................................................. 5
60-70.105 CONTRACT EFFECTIVE DATES (CED) ............................................................... 5
60-70.106 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION
OF CONTRACT...................................................................................................... 5
60-70.107 CONTRACT ADMINISTRATION AND COMMUNICATIONS ................................. 5
60-70.108 SECURITY ............................................................................................................. 6
60-70.109 ACCESS CONTROL .............................................................................................. 6
60-70.110 JFC NAPLES FURNISHED PROPERTY ............................................................... 6
60-70.111 OPTION.................................................................................................................. 6
60-70.112 CHANGES.............................................................................................................. 6
60-70.2 – CONTRACTOR SECTION 7
60-70.201 CONTRACTOR RESPONSIBILITY........................................................................ 7
60-70.202 SUB-CONTRACTS................................................................................................. 7
60-70.203 WORKING HOURS ................................................................................................ 7
60-70.204 IMPLEMENTATION SCHEDULE ........................................................................... 7
60-70.205 CONTRACTOR PERSONNEL ............................................................................... 8
60-70.206 CONTRACTOR EQUIPMENT ................................................................................ 8
60-70.207 CORRUPTION AND ILLICIT GRATUITIES............................................................ 8
60-70.208 RELEASE OF NEWS/INFORMATION ................................................................... 8
60-70.3 – GENERAL INFORMATION SECTION 9
60-70.301 AUTHORISATION TO PERFORM ......................................................................... 9
60-70.302 PROTECTION AND INDEMNIFICATION............................................................... 9
60-70.303 HEALTH, SAFETY AND ACCIDENT PREVENTION ............................................. 9
60-70.304 SAFETY, TESTS AND INSPECTIONS ................................................................ 10
60-70.305 INSURANCE ........................................................................................................ 10
60-70.306 MAINTENANCE OF JFC NAPLES PREMISES ................................................... 10
60-70.4 – FINANCIAL SECTION 11
60-70.401 PREFERRED CUSTOMER.................................................................................. 11
60-70.402 PRICES, TAXES AND CUSTOMS CHARGES .................................................... 11
60-70.403 INVOICES ............................................................................................................ 11
60-70.404 PAYMENTS.......................................................................................................... 12
60-70.405 ADVANCE PAYMENTS........................................................................................ 12
60-70.406 BANK GUARANTEE............................................................................................. 12
60-70.5 – RECEIVING SECTION 12
60-70.501 INSPECTION........................................................................................................ 13
60-70.502 MARKING AND LABELLING................................................................................ 13
60-70.503 NOTICE OF SHIPMENT....................................................................................... 13
60-70.504 TITLE TO PROPERTY AND RISK OF LOSS....................................................... 13
60-70.505 ACCEPTANCE ..................................................................................................... 13
60-70.506 WARRANTY ......................................................................................................... 14
60-70.507 SERVICE AND PARTS AVAILABILITY................................................................ 15
60-70.508 VARIATION IN QUANTITY................................................................................... 15
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 3 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.6 – PERFORMANCE SECTION 15
60-70.601 DISPUTES............................................................................................................ 15
60-70.602 JFC NAPLES DELAY OF WORK ......................................................................... 15
60-70.603 LIQUIDATED DAMAGES ..................................................................................... 15
60-70.604 TERMINATION FOR CONVENIENCE ................................................................. 16
60-70.605 TERMINATION FOR DEFAULT ........................................................................... 17
60-70.606 SPECIAL TERMINATION CLAUSE...................................................................... 16
60-70.607 CONTRACTOR NOTICE OF DELAY ................................................................... 17
60-70.608 STOP WORK ORDER.......................................................................................... 17
60-70.7 – COPYRIGHT SECTION 17
60-70.701 SOFTWARE RELEASES AND UPDATES........................................................... 17
60-70.702 RIGHTS IN TECHNICAL DATA AND COMPUTER SOFTWARE ........................ 18
60-70.703 TECHNICAL BROCHURES AND MAINTENANCE PLANNING........................... 18
60-70.704 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT ............................................................................ 18
60-70.705 PATENT INDEMNITY........................................................................................... 18
60-70.8 – CONSTRUCTION SECTION 18
60-70.801 PERFORMANCE BONDS.................................................................................... 18
60-70.802 COMMENCEMENT, EXECUTION AND COMPLETION OF WORK .................... 18
60-70.803 ON-SITE UTILITIES ............................................................................................. 18
60-70.804 STORAGE............................................................................................................ 18
60-70.805 SITE PROTECTION ............................................................................................. 18
60-70.806 WORKS AND VARIATIONS................................................................................. 18
60-70.807 NATO PROVIDED DRAWINGS ........................................................................... 18
60-70.808 AS–BUILT DRAWINGS........................................................................................ 18
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 4 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.1 – CONTRACT ADMINISTRATION SECTION
60-70.101 DEFINITIONS
As used throughout the contract, the following terms shall have meanings as set forth below:
The term “Potential Bidder” shall refer to the entity that has completed and returned the Enclosure of the transmittal letter of this solicitation, and has indicated thereon its intention, without commitment, to participate in the bidding.
The term “Bidder” shall refer to the bidding entity that has submitted a bid in response to this solicitation.
The term “Contractor” shall refer to the entity (firm or person) to whom the contract is awarded and on whose behalf duly authorised person shall execute it.
The term “Contracting Officer” (CO) shall refer to the person executing and managing this contract on behalf of NATO.
The term “Contract Administrator” (CA) means and shall refer to an individual appointed by the CO responsible for the Administration of the contract.
The term “Contracting Officer’s Technical Representative” (COTR) is the person designated in writing by the CO to be his/her authorised representative charged with the overall technical supervision of the contract and with measuring/monitoring Contractor performance.
The term “SOW” shall refer to the Statement of Work /Technical Specifications.
The term “NATO” shall refer to the North Atlantic Treaty Organisation.
The term “JFC Naples” shall refer to the Allied Joint Force Command, Naples, located at Via Madonna del Pantano, Localita’ Lago Patria, Giugliano in Campania, Naples – Italy.
The term “Days” as used in this solicitation shall, unless otherwise stated, be interpreted as meaning calendar days.
The term “Calling Officer” refers to a person who has been authorized in writing by the CO to issue Delivery Orders.
“Installation Safety Officer” means the staff member of JFC Naples for the purpose of determining compliance with health protection, hygiene and safety regulations.
The term “Supply Order” or “Provision Order” refers to a request for supply against a previously awarded contract (referred to as IDIQ in the English version).
The term “Open Contract” refers to a supply contract, up to a set maximum amount, of undefined quantities of goods or services whose unit value is established in the contract.
The term “Potential Contractor” refers to an entity (individual or company) that has filled in and returned the NOTICE attached to the invitation to bid letter for this solicitation and that has notified its intention to participate in it.
The term “CED” means Contract Effective Date refers to the date final award of the contract has been made. This date will typically be consistent with the date of last signature by the contracting parties, or a specific date set forth in the contract.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 5 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.102 AUTHORITY
1. Any modifications, including changes, additions or deletions and instructions under the
contract shall not be binding unless issued in writing by the JFC Naples CO or CA.
For Calling Officers and COTRs the authority, and responsibility, is limited to what is stipulated in the relevant clauses of these General Contractual Provisions and only the authority to provide advice and/or direction to the Contractor that does not create an additional financial liability above what has already been contractually established in the contract.
The JFC Naples CO is the only one that can financially and contractually obligate NATO.
60-70.103 ORDER OF PRECEDENCE
In the event of any inconsistency in the contract, unless otherwise provided herein, the inconsistency shall be resolved by giving precedence in the following order:
1st The Part I of the Contract signed between both parties;
2nd The Special Provisions (Part III, Section A);
3rd Statement of Requirements (Part III, Section B);
4th These General Provisions (Part II);
5th The Contractor's Proposal accepted by JFC Naples;
6th The laws and customary practices of the country where the contract is performed.
60-70.104 APPLICABLE LAW
1. Except as otherwise provided, the contract shall be governed, interpreted and construed
in accordance with the laws of Italy.
2. When performing at a JFC Naples installation, the Contractor and his personnel shall
comply with all relevant officials NATO and local installation Directives and any applicable laws
of the host nation.
60-70.105 CONTRACT EFFECTIVE DATES (CED)
The effective date of the contract is the date of last signature by the contracting parties, or a specific date set forth in the Contract.
60-70.106 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT
In the event of inconsistency between any terms of the contract and any translation thereof into another language, the English language meaning shall take precedence.
60-70.107 CONTRACT ADMINISTRATION AND COMMUNICATIONS
1. All notices and communications between the Contractor and JFC Naples shall be written in English and addressed to the CO, may be hand delivered, mailed, e-mailed or faxed.
2. Any discussion/negotiation between Contractor and JFC Naples representatives shall be recorded in Minutes by the CO. If there is a change in the contract terms and conditions, a modification will be executed.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 6 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.108 SECURITY
1. The Contractor shall comply with all security requirements prescribed by JFC Naples and the National Security Authority or designated security agency of each NATO country in which the contract is performed.
2. The Contractor shall be responsible for the safeguarding of NATO classified information or any other information labelled sensitive, entrusted to it or generated by it in connection with the performance of the contract. It undertakes not to pass on to anyone outside its staff information provided for the performance of the contract, or any information or to use it for any purpose whatsoever. To this effect, all Contractor personnel shall be required to sign a non-disclosure statement.
3. Any known or suspected breaches of security or other matters of security significance shall be reported immediately by the Contractor to the CO.
4. The Contractor accepts to terminate immediately the duties at JFC Naples location of any employee whose presence is deemed undesirable by JFC Naples on the same day that such notification is given by the CO or JFC Naples Security Officer, without JFC Naples being required to state the reason. Furthermore, in no case may JFC Naples be held responsible for the consequences of such a decision.
60-70.109 ACCESS CONTROL
Before commencing work on the JFC Naples installation, the Contractor’s personnel must be in possession of an access card, and all his vehicles must display access permits. The request for these documents must be submitted to the CO and the contractor should plan around fifteen (15) working days to obtain these. The access cards and permits remain valid for one (1) year maximum and any renewal must be requested at least fifteen (15) working days before the expiration date. Time lost due to the failure of the Contractor to request in a timely manner access cards and access permits will not entitle them to a claim for lost time or for an extension of the completion date for the performance of the contract.
60-70.110 JFC NAPLES FURNISHED PROPERTY
1. The term “JFC Naples Furnished Property” as used in this clause refers to items of
equipment, material or property furnished by JFC Naples to the Contractor which shall be
subject to overhaul, repair, test, embodiment or other work as specified in the contract to be
performed by the Contractor.
2. JFC Naples shall deliver to the Contractor, for use only in connection with the contract,
the property described in the contract (hereinafter referred to as “furnished property”), at the
times and locations stated therein. If JFC Naples furnished property suitable for its intended
use, is not so delivered to the Contractor, the CO shall, upon timely written request made by the
Contractor and if the facts warrant such action, equitably adjust any affected provision of the
contract.
3. Title to JFC Naples furnished property shall remain vested, in JFC Naples. The
Contractor shall maintain adequate property control records of JFC Naples furnished property in
accordance with sound industrial practice.
4. Unless otherwise provided in the contract, the Contractor, upon delivery to him of any
JFC Naples furnished property shall assume the risk of, and shall be responsible for, any loss
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 7 of 21
NATO UNCLASSIFIED
10 September 2026
thereof, or damage thereto, except for reasonable wear and tear, and except to the extent that
such property is consumed in the performance of the contract.
5. The Contractor shall not modify any JFC Naples furnished property unless specifically
authorised by the CO or directed by the terms of the contracts.
60-70.111 OPTION
1. JFC Naples shall have the unilateral right to exercise any or all the options, in whole or in part, at the firm fixed, not-to-exceed prices and at the conditions set forth in the contract. Options are exercised in writing by the CO at least ninety (90) working days before the expiration of the contract.
2. The options may be exercised by JFC Naples either as a modification to the initial contract or as a separate contract, incorporating all applicable terms and conditions.
60-70.112 CHANGES
1. Any changes, modifications, additions or deletions and instructions under the contract shall
not be binding unless issued in writing as formal amendments by the CO and signed by both
Parties in the same manner as the contract;
2. If any such change causes an increase or decrease in the cost of, or the time required for
the performance of any part of the work under the contract, a negotiated adjustment shall be
made in the contract price or delivery schedule, or both, and the contract shall be modified in
writing accordingly.
3. Failure to agree to any adjustment shall be a dispute concerning a question of fact within
the meaning of the clause of the contract entitled “Disputes”. However, nothing in this clause
shall excuse the Contractor from proceeding with the contract as changed.
60-70.2 – CONTRACTOR SECTION
60-70.201 CONTRACTOR RESPONSIBILITY
The Contractor shall be responsible for the execution of all terms of the Contract. It may not delegate or transfers its rights or obligations without the prior written permission of the CO.
60-70.202 SUB-CONTRACTS
RESERVED
60-70.203 WORKING HOURS
1. The work shall be performed on an “as-needed basis”, usually during weekdays in accordance with the official working hours of JFC Naples .The Contractor shall obtain from the CO the list of JFC Naples holidays during the period of performance for the contract.
2. Start times and planning of various stages of the work shall be coordinated with the COTR this schedule shall be adhered to.
3. Exceptionally, the Contractor accepts that JFC Naples may have requirements that require work be performed outside the normal working hours, such as Saturdays and Sundays, as the mission and needs of the requiring activity dictates. There shall be no additional compensation
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 8 of 21
NATO UNCLASSIFIED
10 September 2026
for this work as the contract service can be utilized as needed so long as it is fully coordinated ahead of time as per the SOW.
60-70.204 IMPLEMENTATION SCHEDULE
1. For all works or projects stipulated in the contract or the Call-Order, the Contractor shall submit prior to commencing any works and for approval by the CO, a practicable planning and implementation schedule. The schedule shall show as a minimum the supply phase, the construction phase, and the test and acceptance phase. The construction phase shall show the major construction activities. The date to begin and end the phases and activities must be clearly indicated. The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the progress of work at any given time. The contractor shall enter on the chart the actual progress at such intervals as directed by Contracting and shall immediately deliver to the CO three copies thereof.
2. If the contractor falls behind a previously agreed progress schedule, the contractor shall take such steps as are necessary to improve his progress. Also, the CO may require him to increase the number of shifts, overtime operations, days of work, or the amount of construction plant, or all of them, and to submit for approval such supplementary schedule or schedules in chart form as may be deemed necessary to demonstrate the manner in which the agreed rate of progress will be regained; all at no additional cost to NATO.
3. Failure of the contractor to comply with the above may result in the termination for default of the relevant works or project by the CO on the grounds that the contractor is not executing the work with such diligence as will ensure completion within the time specified in the contract or the Call Order. The CO may then exercise his right to have the project completed by a third party and the additional cost and damages thereof charged to the Contractor.
60-70.205 CONTRACTOR PERSONNEL
1. The contractor shall provide and pay, as required, qualified personnel as needed for the proper performance of the services required under the contract; he shall strictly comply with all Host Nation Labour Laws, tariffs and social security and other regulations applicable to the employment of his personnel.
2. Privileges and Immunities granted to JFC Naples personnel are an exclusive right and as such not transferable to the Contractor and his employees. This includes the right to access and use the facilities managed and/or operated by JFC Naples’s Community Services.
3. The Contractor’s status shall be that of an independent Contractor and it is expressly understood that the Contractor (and its personnel) shall not be considered in any respect as being employees, servants or agents of JFC Naples.
4. JFC Naples will not give any directives to the Contractor’s personnel for any matter under the Contract other than safety and security instructions.
60-70.206 CONTRACTOR EQUIPMENT
1. The contractor shall furnish, install and maintain his own furniture and equipment without any cost or expense to JFC Naples. Approval from CO is required prior to the installation of any major item of contractor equipment. The equipment, furniture and fixtures provided by the contractor shall not be removed without prior written approval of the CO and, in the event of removal; all costs and expenses thereof shall be borne by the contractor.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 9 of 21
NATO UNCLASSIFIED
10 September 2026
2. All property of the Contractor while at JFC Naples’s premises shall be at the risk of the Contractor, and JFC Naples shall accept no liability for any loss or damage, except to the extent that any loss or damage is the result of a willful act or gross negligence on the part of JFC Naples’s agents, representatives or employees.
60-70.207 CORRUPTION AND ILLICIT GRATUITIES
1. The contractor grants that neither he nor his agents or representatives have offered or given any gratuity whatsoever to any NATO personnel, with a view to securing a contract or favourable treatment regarding the award, modification or execution of the contract.
2. The JFC Naples CO may, by registered letter, terminate the contract without notice if it is found, after an investigation instituted by NATO, that gratuities (in the form of entertainment, gifts or others) were offered or given by the contractor to NATO personnel with respect to the award of the contract or to the taking of any decision regarding its execution.
60-70.208 RELEASE OF NEWS/INFORMATION
1. No news release (including photographs and films, public announcements or denial or confirmation of same or interviews with news media representatives) on any part of the subject matter of the contract or any phase of any programme hereunder shall be made without prior written approval by the CO.
2. Furthermore, the Contractor shall, in no other manner whatsoever use the name, emblem or official seal of JFC Naples and/or any NATO Headquarters in connection with its business or otherwise.
60-70.3 – GENERAL INFORMATION SECTION
60-70.301 AUTHORISATION TO PERFORM
The Contractor warrants that they have been duly authorized to provide the required services and do business in the country or countries in which the contract is to be performed. That they have obtained or will obtain all necessary licenses and permits required in connection with the contract. That they will fully comply with all the laws, decrees, labour standards and regulations of such country or countries during the performance of the contract and that no claim for additional monies with respect to any authorisations to perform will be made upon JFC Naples.
60-70.302 PROTECTION AND INDEMNIFICATION
1. The contractor in the performance of the contract shall at all times hold JFC Naples, its agents, representatives and employees harmless from any and all suits, claims, charges and expenses which arise out of acts or omissions of the contractor; his agents, representatives or employees.
2. The Contractor shall indemnify and hold JFC Naples harmless against claims for injury to persons or damages to property of the Contractor, of JFC Naples or other parties arising from the Contractor's possession or use of JFC Naples furnished property, including facilities and utilities.
3. The contractor shall repair at his expense any damage resulting from his work and inflicted to the JFC Naples buildings, equipment, services, utilities, roads and grassed areas, where such work is not included in the scope of work. In the case of buried utilities, this will apply to any utility, which was previously notified to the contractor by the issue of a digging permit. The repair work
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 10 of 21
NATO UNCLASSIFIED
10 September 2026
shall be done according to the CO’s specifications. All excavations and damages to other areas that were not a part of the contract work shall be repaired at the contractor's expense.
60-70.303 HEALTH, SAFETY AND ACCIDENT PREVENTION
1. Except as otherwise provided in the contract, it shall be governed, interpreted and construed in accordance with the laws of the Local HQs Host Nation (contracts)/Italian law. The Contractor as well as the Contractor’s personnel shall comply with generally accepted European standards for health, safety at work and with similar laws and regulations at all JFC Naples sites where work under the contract is performed or will be performed.
2. If the CO notifies the Contractor in writing of any non-compliance in the performance of the contract, with regard to health, safety and accident prevention laws and regulations and the Contractor fails to take immediate corrective action, then the JFC Naples CO or the ACO may order the Contractor to stop all or part of the work until satisfactory corrective action has been taken. Such an order to stop work shall not entitle the Contractor to an adjustment of the contract price or other reimbursement for resulting increased costs or losses.
3. At any time, JFC Naples Safety Officer and Host Nation labour inspection authorities will be entitled to inspect any Contractor’s activities in order to guarantee that this clause is enforced.
60-70.304 SAFETY, TESTS AND INSPECTIONS
It is the Contractor’s responsibility to obtain, at no additional cost to JFC Naples, the required official certificates for all parts, equipment and installations (such as tanks, generators, transformers, gas lines, etc). The certificates, together with the validated test reports, shall be available and submitted to the CO prior to the start of the acceptance testing by JFC Naples. In case of a disagreement between the CO and the contractor concerning the conformity of materials and equipment, tests may be called for by JFC Naples, whereby in the event of failure of the item under test, all costs associated with the tests costs shall be at the contractor's expense. All new electrical and mechanical installations or modifications must be inspected and accepted by a certified inspection agency when required by Host Nation or International regulations
60-70.305 INSURANCE
1. At all times during the performance, the Contractor shall procure and maintain, without any
cost to JFC Naples, any workmen’s compensation, employees’ liability or other type of insurance
required by the host nation’s laws.
2. The Contractor shall procure and maintain, without any cost to JFC Naples, a suitable civil
liability insurance to cover damage that could be caused to JFC Naples property and/or
individuals. This insurance will be submitted to the Contracting Officer for verification of adequacy
upon request.
60-70.306 MAINTENANCE OF JFC NAPLES PREMISES
1. If JFC Naples premises are put at disposal of the Contractor, he shall maintain these premises safe, secure and clean. He shall also assume all expenses of repair caused by his negligence, that of his employees, or any other deed for which he may be held responsible. The contractor shall not make any alterations to the premises without prior written approval of CO.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 11 of 21
NATO UNCLASSIFIED
10 September 2026
2. The premises shall be available for inspection at any time by JFC Naples.
3. Failure by the contractor to fulfil any of the provisions in the above paragraphs, after appropriate written notice by the CO, shall give JFC Naples the right to cause these provisions to be fulfilled to JFC Naples’s requirements and to pass the full costs of such fulfilment to the contractor for immediate reimbursement to JFC Naples without regard to any actions the contractor may plan to take to obtain reimbursement from any other party or parties.
60-70.4 – FINANCIAL SECTION
60-70.401 PREFERRED CUSTOMER
1. The Contractor warrants that the prices set forth in the contract are as favourable as those extended to any Government, Agency, Company, Organisation or individual purchasing like quantities covered by the contract under similar conditions. In the event that prior to complete delivery under the contract the Contractor offers any of such items in substantially similar quantities to any customer at prices lower than those set forth herein, the Contractor shall so notify JFC Naples and the prices of such items shall be correspondingly reduced by a supplement to the contract.
2. Prices in this sense means “Base Price” prior to applying any bonuses, export tax reduction, turnover tax exemptions and other reductions based on National Policies.
60-70.402 PRICES, TAXES AND CUSTOMS CHARGES
1. Unless otherwise indicated in the contract, all prices are firm and fixed, except for taxes and custom charges, if due.
2. JFC Naples by virtue of its status is exempt from all taxes and all customs charges on merchandise and services. The Contractor, therefore, certifies that the prices stipulated in the contract do not include amounts to cover such taxes or customs charges.
60-70.403 INVOICES
1. The Contractor shall submit invoices solely in electronic format on monthly base for
services performed under the contract within the first ten (10) working days of each month.
2. Each invoice shall contain:
a. Invoice Reference Number and Issue Date
b. Name and Address of JFCNP
c. Contract Number and Title
d. Purchase Order Number (if applicable)
e. Description of services and deliverables provided
f. Quantities and Unit Prices (exclusive of taxed and duties)
g. Total amount to be paid
h. Contractor’s bank account details for electronic funds transfer:
(1) SWIFT Code;
(2) IBAN;
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 12 of 21
NATO UNCLASSIFIED
10 September 2026
(3) BLZ or Bank Routing Number (if applicable);
(4) Bank Name;
(5) Account Name.
3. Payments under this contract shall be made in Euro.
4. The standard terms for JFCNP are 30 calendar days from receipt of a proper invoice.
5. Foreign companies shall submit invoices electronically to: hqjfcnp.mbxapar@nato.int
6. Italian companies shall submit invoices electronically to:
finance-accounting@jfcnp.nato.postecert.it and a courtesy copy shall be submitted to: hqjfcnp.mbxapar@nato.int
60-70.404 PAYMENTS
1. Payment for all services shall be made within thirty (30) calendar days after receipt of properly supported and acceptable invoices submitted upon completion of delivery or of the works, inspection and acceptance.
2. No payment shall be made with respect to undelivered services, work not performed and/or services not rendered under the contract.
3. Payment will be effected in the currency or currencies of the contract.
4. JFC Naples shall not bear any cost related to financial guarantees, which the Contractor is required to provide under the contract.
60-70.405 ADVANCE PAYMENTS
No advance payments shall be authorised except as otherwise provided in the contract. The JFC Naples CO may authorize advance payments on a case-by-case (by project) basis not to exceed ten (10%) percent of the total project cost on the condition that the contractor establishes an equivalent Bank Guarantee in favour of JFC Naples.
60-70.406 BANK GUARANTEE
1. The Contractor shall furnish a Bank Guarantee commitment, e.g., irrevocable letter of
credit, or such other financial instrument issued by a Host Nation banking institution governed by
Host Nation legislation and acceptable to the CO.
2. Limited or automatically terminated bank guarantees are not acceptable.
3. The Bank Guarantee will represent 10% of the total amount of the base-year. The
Contractor is obliged to renew it for every option year of the contract.
4. The Bank Guarantee must be delivered to the CO within one (1) month of award of the
contract.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 13 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.5 – RECEIVING SECTION
60-70.501 INSPECTION
1. Unless otherwise specifically provided for or approved by JFC Naples in the specifications,
all equipment, materials and articles incorporated in the work covered by the contract are to be
new and of the most suitable grade of their respective kinds for the purposes intended.
2. All services (which terms throughout this clause includes without limitation raw materials,
components, intermediate assemblies, and end products) shall be subject to inspection and test
by JFC Naples, to the extent practicable at all times and places including the period of
manufacture, and in any event prior to acceptance.
3. In case any services are defective in material or workmanship or otherwise not in
conformity with the requirements of the contract, JFC Naples shall have the right either to reject
them (with or without instructions as to their disposition) or to require their correction or to accept
them against reduction in price, which is equitable under the circumstances.
4. If any inspection or test is made by JFC Naples on the premises of the Contractor, the
Contractor without additional charge shall provide all reasonable facilities and assistance to JFC
Naples inspectors in the performance of their duties.
5. If JFC Naples inspection or test is made at a point other than the premises of the
Contractor, it shall be at the expense of JFC Naples except as otherwise provided in the contract.
In case of rejection JFC Naples shall not be liable for any reduction in value of samples used in
connection with such inspection or test.
6. JFC Naples reserves the right to charge to the Contractor any additional cost of JFC
Naples inspection and test when services are not ready at the time such inspection, when test is
requested by Contractor or when further inspection or retest is necessitated by prior rejection.
7. Failure to inspect services shall neither relieve the Contractor from responsibility for such
services, as are not in accordance with the contract requirements nor impose liability on JFC
Naples therefore.
8. The inspection and test by JFC Naples of any services does not relieve the Contractor
from any responsibility regarding defects or other failures to meet the contract requirements,
which may be discovered prior to acceptance. Except as otherwise provided in the contract,
acceptance shall be conclusive except as regards latent defects, hidden deficiencies, fraud, or
such gross mistakes as amount to fraud.
60-70.502 MARKING AND LABELLING
RESERVED
60-70.503 NOTICE OF SHIPMENT
RESERVED
60-70.504 TITLE TO PROPERTY AND RISK OF LOSS
RESERVED
60-70.505 ACCEPTANCE
1. Acceptance or rejection of the services shall be made as promptly as practicable after task
completion, except as otherwise provided in the contract.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 14 of 21
NATO UNCLASSIFIED
10 September 2026
2. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting
to fraud, or otherwise stated in the contract. It is the action by which JFC Naples acknowledges
that the Contractor has fully demonstrated that the tasks are complete.
3. Acceptance will be accomplished when the following requirements are met:
a. Availability at final destination of all deliverables;
b. Successful completion of tasks;
c. Verification of the inventory;
d. Satisfactory completion of all training or other services, if any, required by that date;
e. Agreement between the CO and the Contractor on a discrepancy list (if necessary)
and corresponding clearance dates.
60-70.506 WARRANTY
1. Notwithstanding inspection and acceptance by JFC Naples of services furnished under the
contract or any provision of the contract concerning the conclusiveness thereof, the Contractor
warrants that for a period of twelve (12) months or whichever longer period provided by the
manufacturer or relevant Host Nation law following the date of acceptance:
a. All services furnished under the contract will be free from defects in material or
workmanship and will conform with the specifications and all other requirements of the
contract; and
b. The preservation, packaging, packing and marking and the preparation for and
method of delivery of such services will conform to the requirements of the contract.
The CO shall give written notice to the Contractor of any breach of the warranties in paragraph 1.a. of this clause within thirty (30) days after discovery of any defect.
2. Within a reasonable time after such notice, the CO may either:
a. By written notice require the prompt correction or replacement of any services or
part thereof (including preservation, packaging, packing and marking) that do not conform
with requirements of the contract within the meaning of paragraph a. of this clause; or
b. Retain such services, whereupon the contract price thereof shall be reduced by an
amount equitable under the circumstances and the Contractor shall promptly make
appropriate payment.
4. When return, correction or replacement is required, the CO shall return the services and transportation charges and responsibility for such services while in transit shall be borne by the Contractor. However, the Contractor’s liability for such transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the designated destination point under the contract and the Contractor's plant and return.
5. If the Contractor does not agree as to his responsibility to correct or replace the services delivered, he shall nevertheless proceed in accordance with the written request issued by the CO under paragraph 3 above to correct or replace the defective or nonconforming supplies. In the event it is later determined that such services were not defective or nonconforming within the provisions of this clause, the contract price will be equitably adjusted. Failure to agree to such an equitable adjustment of price shall be a dispute concerning a question of fact within the meaning of the clause of the contract entitled “Dispute”.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 15 of 21
NATO UNCLASSIFIED
10 September 2026
6. Any supplies or parts thereof furnished in replacement pursuant to this clause shall also be subject to all the provisions of this clause to the same extent as supplies initially delivered. Corrected parts will be warranted for a period not less than six (6) months starting at the time the part is received back at the user’s location.
7. In case of a provisional acceptance the warranty period starts at the date of provisional acceptance and ends twenty-four (24) months after the date of final acceptance.
8. Failure to agree upon any determination to be made under this clause shall be a dispute concerning a question of fact within the meaning of the “Disputes” clause of the contract.
9. The rights and remedies of JFC Naples provided in this clause are in addition to and do not limit any rights afforded to JFC Naples by any other clause of the contract.
60-70.507 SERVICE AND PARTS AVAILABILITY
Unless as specified otherwise in the technical Specifications, the Contractor will maintain and furnish a source of an adequate supply of services, components, spare parts and sub-assemblies to properly maintain the supplies or services for a minimum of five (5) years from Contract Effective Date.
60-70.508 VARIATION IN QUANTITY
RESERVED
60-70.6 – PERFORMANCE SECTION
60-70.601 DISPUTES
1. All disputes arising out of the performance of the contract will be settled through amicable settlement between the CO and the Contractor.
2. Should the CO and the Contractor fail to come to an amiable settlement of the dispute, the dispute will be settled in the competent Court of the Host Nation, arbitration councils included, unless otherwise specified in the contract. In case of using the judicial avenue, the Contractor shall waive the coverage of those courts corresponding to its fiscal residence in order to rise before the competent Host Nation court.
60-70.602 JFC NAPLES DELAY OF WORK
1. If the performance of all or any part of the work is delayed or interrupted by an act of the
CO in the administration of the contract, which act is not expressly or implicitly authorized by the
contract, or by his failure to act within the time specified in the contract (or within a reasonable
time if no time is specified), an adjustment shall be made for any increase in the cost of
performance of the contract caused by such delay or interruption and the contract modified in
writing accordingly. Adjustment shall be made also in the delivery or performance dates and any
other contractual provision affected by such delay or interruption. However, no adjustment shall
be made under this clause for any delay or interruption
a. to the extent that performance would have been delayed or interrupted by any other
cause, including the fault or negligence of the Contractor; or
b. for which an adjustment is provided or excluded under any other provision of the
contract.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 16 of 21
NATO UNCLASSIFIED
10 September 2026
2. No claim under this clause shall be allowed
a. for any costs incurred more than twenty (20) days before the Contractor shall have
notified the CO in writing of the act or failure to act; and
b. unless the claim in an amount stated, is asserted in writing as soon as practicable
after the termination of such delay or interruption, but not later than the date of final
payment under the contract.
3. No claim under this clause shall be allowed for any delay resulting from the restriction of
access to JFC Naples facilities as a consequence of the conduct of security or safety exercises
provided that such restrictive measures do not exceed five (5) working days over a year period,
and that the access restrictions are notified by the CO, in writing, to the Contractor at least seven
(7) days prior to their implementation.
60-70.603 LIQUIDATED DAMAGES
1. For each calendar day of delay in the performance of any relevant task or duty under the
Contract, and in lieu of actual damage, the Contractor shall pay to JFCNP as fixed, agreed, and
liquidated damages, 0.1 % of the total contract price, less handling, transportation and taxes, to
a maximum of 10% of the contract price. Alternatively, JFCNP may terminate this Contract in
whole or in part as provided in the first paragraph of the “DEFAULT” clause and in that event the
Contractor shall be liable, in addition to the excess costs provided in second paragraph of the
“DEFAULT” clause, for such liquidated damages accruing until such time as JFCNP may
reasonably obtain delivery or performance of similar supplies or services.
2. The Contractor shall not be charged with liquidated damages when the delay arises out of
causes beyond the control and without the fault or negligence of the Contractor, as defined in
third paragraph of the “DEFAULT” clause and in such event, subject to the “DISPUTES” clause,
the Contracting Officer shall ascertain the facts and extent of the delay and shall extend the time
for performance of the contract when in his judgement the findings of fact justify an extension.
60-70.604 TERMINATION FOR CONVENIENCE
1. The performance of work under the contract may be terminated by JFC Naples in
accordance with this clause in whole, or in part, whenever the CO shall determine that such
termination is in the best interest of JFC Naples. Any such termination shall be effected by
delivery to the Contractor of a Notice of Termination specifying the extent to which performance
of work under the contract is terminated and the date upon which such termination becomes
effective.
2. After receipt of a Notice of Termination and except as otherwise directed by the CO, the
Contractor shall:
a. Stop work under the contract on the date and to the extent specified in the Notice
of Termination;
b. Place no further orders for material, services or facilities, except as may be
necessary for completion of such portion of the work under the contract as is not
terminated;
c. Terminate all orders to the extent that they relate to the performance of work
terminated by the Notice of Termination;
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 17 of 21
NATO UNCLASSIFIED
10 September 2026
d. Settle all liabilities and all claims arising out of such termination of orders, with the
approval or ratification of the CO, to the extent he may require, which approval or
ratification shall be final for all the purposes of this clause;
e. Transfer title and deliver to JFC Naples in the manner, at the times, and to the
extent, if any, directed by the CO:
(1) The fabricated parts, work in process, completed work, and
(2) The completed or partially completed plans, drawings, information, and other
property which, if the contract has been completed, would have been required to be
furnished to JFC Naples;
f. Complete the performance or complete the part of the performance that at the time
the Notice of Termination is received still needs to be completed.
3. After receipt of a Notice of Termination, the Contractor shall submit to the CO his
termination claim, in the form and with certification prescribed by the CO. Such claim shall be
submitted promptly but in no event later than ninety (90) days from the effective date of
termination. Upon failure of the Contractor to submit his termination claim within the time allowed,
the CO may determine, on the basis of information available to him, the amount, if any due to the
Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so
determined.
4. Subject to the provisions of paragraph 2.c., the Contractor and the CO may agree upon
the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total
or partial termination of work pursuant to this clause, which amount or amounts may include a
reasonable allowance for profit on work done; provided that such agreed amount or amounts
exclusive of settlement costs shall not exceed the total contract price as reduced by the amount
of payments otherwise made and as further reduced by the contract price of work not terminated.
5. In the event of the failure of the Contractor and the CO to agree as provided in paragraph
2.d. upon the whole amount to be paid to Contractor by reason of the termination of work pursuant
to this clause, the CO shall pay to the Contractor the amounts determined by the CO.
6. Unless otherwise provided for in the contract, or by applicable statute, the Contractor, from
the effective date of termination and for a period of three years after final settlement under the
contract, shall preserve and make available to JFC Naples at all reasonable times at the office of
the Contractor but without direct charge to JFC Naples, all his books, records, documents and
other evidence bearing on the costs and expenses of the Contractor under the contract and
relating to the work terminated hereunder, or to the extent approved by the CO, photographs,
micro-photographs, or other authenticated reproductions thereof.
60-70.605 TERMINATION FOR DEFAULT
1. JFC Naples may by written notice of default to the Contractor, terminate the whole or any
part of the contract if any one of the following circumstances:
a. If the Contractor fails to make delivery of the supplies or to perform the services
within the time specified herein or any extension thereof; or
b. If the Contractor fails to perform any of the other provisions of the contract, or so
fails to make progress as to endanger performance of the contract in accordance with its
terms and in either of these two circumstances does not cure such failure within a period
of ten days (or such longer period as the CO may authorise in writing) after receipt of notice
from the CO specifying such failure.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 18 of 21
NATO UNCLASSIFIED
10 September 2026
2. In the event JFC Naples terminates the contract in whole or in part as provided in
paragraph 1. of this clause, JFC Naples may procure supplies or services similar to those so
terminated and the Contractor shall be liable to JFC Naples for any excess costs for such similar
supplies or services. The Contractor shall continue the performance of the contract to the extent
not terminated under the provisions of this clause.
3. The Contractor shall not be liable for any excess costs if the failure to perform the contract
arises out of causes beyond the control and without the fault or gross negligence of the contractor.
4. If the contract is terminated as provided in paragraph 1. of this clause, JFC Naples, in
addition to any other rights provided in the clause, may require the Contractor to transfer title and
deliver to JFC Naples in the manner and to the extent directed by the CO:
a. Any completed supplies and
b. Such partially completed supplies and materials, parts, tools, dies, jigs, fixtures,
plans, drawings, information and contract rights (hereinafter called “manufacturing
materials”) as the Contractor has specifically produced or specifically acquired for the
performance of such part of the contract as has been terminated; and the Contractor shall,
upon direction of the CO, protect and preserve property in the possession of the Contractor
in which JFC Naples has an interest. Payment for completed supplies delivered to and
accepted by JFC Naples shall be at the contract price. Payment for manufacturing
materials delivered to and accepted by JFC Naples and for the protection and preservation
of property shall be in an amount agreed upon by the Contractor and CO; failure to agree
such amount shall be a dispute concerning a question of fact within the meaning of the
clause of the contract entitled “Disputes”. JFC Naples may withhold from amounts
otherwise due the Contractor for such completed supplies or manufacturing materials such
sum as the CO determines to be necessary to protect JFC Naples against loss because
of outstanding liens or claims of former lien holders.
5. If, after notice of termination of the contract under the provisions of this clause, it is
determined for any reason that the Contractor was not in default under the provisions of this
clause, or that the default was excusable under the provisions of this clause, the rights and
obligations of the parties shall, if the contract contains a clause providing for termination for
convenience of JFC Naples, be the same as if the notice of termination had been issued pursuant
to such clause. If, after such notice of termination of the contract under the provisions of this
clause, it is determined for any reason that the Contractor was not in default under the provisions
of this clause, and if the contract does not contain a clause providing for termination for
convenience of JFC Naples the contract shall be equitably adjusted to compensate for such
termination and the contract modified accordingly; failure to agree to any such adjustment shall
be a dispute concerning a question of fact within the meaning of the clause of the contract entitled
“Disputes”.
6. Both parties are under duty of good faith. The contract includes not only the specific terms,
but also law and customary practice applicable in the place where the contract is to be carried out
and to the Type of Trade to which the contract relates.
60-70.606 SPECIAL TERMINATION CLAUSE
1. If at any time while the contract is in force either party finds itself in one of the following situations:
a. Death, supervened incapacity or extinction of its legal entity;
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 19 of 21
NATO UNCLASSIFIED
10 September 2026
b. Declaration of bankruptcy, reorganisation of debts, take over by a trustee, or any
other legal status implying lack of capacity to enter new financial liabilities;
c. Change of activity in such a manner that it becomes incompatible with the purpose
of the contract.
2. Then the other party shall be entitled to terminate the contract upon giving written notice of termination under the provisions of this clause to the other party. Such termination shall not be considered as termination for convenience and shall be effective on the date stated on the notice of termination.
60-70.607 CONTRACTOR NOTICE OF DELAY
In the event the Contractor encounters difficulty in meeting performance requirements, or when he anticipates difficulty in complying with the contract delivery schedule or date, he shall immediately notify the CO in writing, giving pertinent details; provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by JFC Naples of any delivery schedule or date, or of any rights or remedies provided by law or under the contract.
60-70.608 STOP WORK ORDER
1. The CO may, at any time, by written order to the Contractor, require the Contractor to stop
all, or any part, of the work called for by the contract for a period of ninety (90) days after the order
is delivered to the Contractor and for any further period to which the parties may agree. Any such
order shall be specifically identified as Stop Work Order issued pursuant to this clause. Upon
receipt of such an order, the Contractor shall forthwith comply with its terms and take all
reasonable steps to minimize the incurrence of costs allocable to the work covered by the order
during the period of work stoppage. Within a period of ninety (90) days after a stop work order is
delivered to the Contractor, or within any extension of the period to which the parties shall have
agreed, the CO shall either:
a. Cancel the stop work order, or
b. Terminate the work covered by such order as provided in the “Termination for
Convenience” clause of the contract.
2. If a stop work order issued under this clause is cancelled, or the period of the order or any
extension thereof expires, the Contractor shall resume work. An equitable adjustment shall be
made in the delivery schedule or contract price, or both, and the contract shall be modified in
writing accordingly, if:
a. The stop work order results in an increase in time required for, or in the Contractor’s
cost properly allowable to, the performance of any part of the contract and
b. The Contractor asserts a claim for such adjustment within thirty (30) days after the
end of the period of work stoppage; provided that, if the CO decides the facts justify such
action, he may receive and act upon any such claim asserted at any time prior to final
payment under the contract.
3. If a stop work order is not cancelled and the work covered by such order is terminated for
the convenience of JFC Naples the reasonable costs resulting from the stop work order shall be
allowed in arriving at the termination settlement.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 20 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.7 – COPYRIGHT SECTION
60-70.701 SOFTWARE RELEASES AND UPDATES
RESERVED
60-70.702 RIGHTS IN TECHNICAL DATA AND COMPUTER SOFTWARE
RESERVED
60-70.703 TECHNICAL BROCHURES AND MAINTENANCE PLANNING
RESERVED
60-70.704 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
RESERVED
60-70.705 PATENT INDEMNITY
RESERVED
60-70.8 – CONSTRUCTION SECTION
60-70.801 PERFORMANCE BONDS
RESERVED
60-70.802 COMMENCEMENT, EXECUTION AND COMPLETION OF WORK
RESERVED
60-70.803 ON-SITE UTILITIES
RESERVED
60-70.804 STORAGE
RESERVED
60-70.805 SITE PROTECTION
1. When work and atmospheric conditions are a source of danger, the Contractor shall supply
and take all necessary measures: barriers, night lighting and warning signs for personnel safety
and the protection of NATO property. Temporary structures, such as ladders or scaffolding, which
present a security hazard to the premises or a safety hazard to persons, shall be removed at the
end of working hours.
2. When required extinguishers or fire blankets shall be provide by the Contractor and placed
in a convenient work area.
3. During the work, the site shall be kept clean and tidy. After completion of the work, the site
shall be thoroughly cleaned by the Contractor and free from all debris. Debris shall be removed
from the area at no additional cost.
4. The Contractor shall repair at their expense any damage caused by their work to buildings,
equipment, services, utilities, roads, grassed and other areas.
NATO UNCLASSIFIED
Part II, General Contractual Provisions RFQ-JFCNP-26-15
Page 21 of 21
NATO UNCLASSIFIED
10 September 2026
60-70.806 WORKS AND VARIATIONS
1. No excavation, penetration, drilling, etc. will be started by the Contractor without a formal
permit from the CO.
2. For all works the Contractor shall, prior to performing any excavation, penetration, drilling,
etc., request and obtain from the CO the location of any known existing buried utilities, such as
cables, piping, or communication lines. Additionally, prior to any such work, a metal, cable or
water-detecting device shall be used to confirm the route of the buried services.
3. Hand excavation methods will be used in the vicinity of known existing services to ensure
protection and care of the existing utility lines. Any unknown cable, pipe or fittings exposed by
the contractor during excavation work shall be brought to the CO’s attention and if directed by the
CO registered in the as-built drawings.
4. At any time, the contractor is to point out to the CO any omissions or inaccuracies he
encounters before or during the execution of the works. If the contractor wishes to offer an
alternative solution to any problem, he may submit any additions, subtractions or alternative
solutions to the CO. A contract modification or a supplementary call order may then be issued to
cover any amendments as applicable.
60-70.807 NATO PROVIDED DRAWINGS
RESERVED
60-70.808 AS–BUILT DRAWINGS
RESERVED
JFCNP IKM - Statement of Work
10-09-2026 Page 1 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
STATEMENT OF WORK
Operational Service Support for JFCNP IKM DevOps - Data Infrastructure Engineer
Table of Contents
Statement of Work........................................................................................................................ 3
1. Introduction .................................................................................................................................. 3
2. Background / Objectives.............................................................................................................. 3
3. Type of Contract and Period of Performance............................................................................. 3
3.1 Type of Contract ............................................................................................................................... 3
3.2 Period of Performance ...................................................................................................................... 3
4. Tasking and Deliverables / Scope of Work................................................................................. 3
4.1 SharePoint Farm Setup and Administration....................................................................................... 4
4.2 Database Setup and Administration .................................................................................................. 4
4.3 Access Management......................................................................................................................... 4
4.4 Messaging and Communication Services Integration......................................................................... 4
4.5 Virtualization and Failover Clustering................................................................................................. 4
4.6 Automation, Scripting and DevOps.................................................................................................... 4
4.7 Cloud and Containerization ............................................................................................................... 4
4.8 Cross-Cutting.................................................................................................................................... 4
4.9 Incident Response ............................................................................................................................ 5
5. Schedule of Delivery / Sprints Planning, Execution and Review.............................................. 5
5.1 Sprint Planning ................................................................................................................................. 5
5.2 Sprint Execution................................................................................................................................ 5
5.3 Sprint Review.................................................................................................................................... 5
6. Acceptance Criteria and Payment Milestones............................................................................ 5
6.1 Acceptance....................................................................................................................................... 5
6.2 Payment Milestones.......................................................................................................................... 6
7. Contractor Performance Requirements and Reporting............................................................. 6
7.1 HQ Representatives.......................................................................................................................... 6
7.2 Problem and Deficiency Reporting .................................................................................................... 6
8. Personnel Required for Statement of Work................................................................................ 6
8.1 Position............................................................................................................................................. 6
8.2 Replacement of Personnel ................................................................................................................ 6
8.3 Qualifications .................................................................................................................................... 6
9. Time Requirements for Contractor Personnel ........................................................................... 7
9.1 Sprint Length .................................................................................................................................... 7
9.2 HQ Daily Working Hours ................................................................................................................... 8
10. Proof of Past Performance .......................................................................................................... 8
11. Place of Performance................................................................................................................... 8
12. Required Travel ............................................................................................................................ 8
13. Furnished Materials and Services............................................................................................... 8
JFCNP IKM - Statement of Work
10-09-2026 Page 2 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
14. Security Clearance ....................................................................................................................... 8
15. Constraints ................................................................................................................................... 8
15.1 Documentation Standards................................................................................................................. 8
15.2 Storage of Materials.......................................................................................................................... 8
15.3 Approved Software, Hardware and Tools .......................................................................................... 9
15.4 Intellectual Property Rights................................................................................................................ 9
Annex A: Sprint Evaluation Sheet (SES) .................................................................................. 10
JFCNP IKM - Statement of Work
10-09-2026 Page 3 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
STATEMENT OF WORK
Operational Service Support for JFCNP IKM DevOps - Data Infrastructure Engineer
1. INTRODUCTION
Generation, aggregation, preservation, integration and exploitation of data depend on a foundation of robust data infrastructure, databases, platforms, repositories and rigorous back-end administration. This Statement of Work sets out the DevOps infrastructure engineering support required to establish, operate and advance the data infrastructure services and platforms, to ensure they effectively deliver value to decision-making and can scale to meet evolving mission requirements.
2. BACKGROUND / OBJECTIVES
The main objectives of this Statement of Work are to:
• Design and implement a robust, scalable infrastructure (Farm, Database, Web App, Server levels).
• Ensure the continuous availability and accessibility of the data platforms and infrastructure.
• Operate, maintain and improve the data infrastructure in line with evolving mission requirements.
• Automate server-level data (logging, aggregation, analytics).
3. TYPE OF CONTRACT AND PERIOD OF PERFORMANCE
3.1 Type of Contract
• Quotations shall be submitted as a firm fixed price per sprint (1 sprint = 1 HQ working week).
• One calendar year comprises an estimate of 46 sprints.
• Payment is made for sprints completed and accepted.
3.2 Period of Performance
The period of performance comprises a Base Year starting in January 2027 followed by two optional periods covering the calendar years 2028 and 2029, exercisable at the discretion of JFCNP.
This task order will be active immediately after the signing of the contract by both parties.
| Period | From | To | Sprints (estimate) |
| 2027 BASE | 01 January 2027 | 31 December 2027 | ~46 |
| 2028 OPTION | 01 January 2028 | 31 December 2028 | ~46 |
| 2029 OPTION | 01 January 2029 | 31 December 2029 | ~46 |
4. TASKING AND DELIVERABLES / SCOPE OF WORK
The Contractor will provide the following services, using an Agile and iterative approach.
4.1 SharePoint Farm Setup and Administration
4.1.1 Setting up and configuring SharePoint farms, including high availability and redundancy, multiple and federated services, search and content farm topologies, farm-to-farm services and the webapplication tier (IIS sites, application pools, certificates and bindings).
JFCNP IKM - Statement of Work
10-09-2026 Page 4 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
4.1.2 Configuring User Profile Services, including profile synchronization from identity sources (AD, LDAP, etc.) at front-end and back-end services.
4.1.3 Configuring the Search Service Application, including topology, content sources, crawl schedules and index management.
4.1.4 Deploying farm-level service applications, including Office Online Servers and workflow engines.
4.2 Database Setup and Administration
4.2.1 Installing, configuring and maintaining the SQL Server platforms, including mounting and unmounting databases and bulk operations.
4.2.2 Establishing database high-availability and clustering, and tuning performance, capacity and storage (indexing, file sizing, growth and disk-capacity planning).
4.2.3 Administering integrity checks, scheduling back-ups, and testing restore/recovery procedures.
4.3 Access Management
4.3.1 Administering ADFS and authentication services (Kerberos, claims-based authentication, conditional access, SSO and RBAC) for SharePoint and related web applications.
4.3.2 Managing certificate services and PKI supporting authentication, including certificate lifecycle and renewal.
4.4 Messaging and Communication Services Integration
4.4.1 Integrating messaging and collaboration services with SharePoint, including SMTP, emailenabled libraries, notifications, alerts and messaging-driven workflows.
4.5 Virtualization and Failover Clustering
4.5.1 Administering virtualization platforms, including virtual machines, hosts and resource allocation, and maintaining infrastructure failover clusters.
4.6 Automation, Scripting and DevOps
4.6.1 Implementing PowerShell automation and configuration management across the platforms, including scheduled jobs (e.g. Windows, SQL and SharePoint scheduled tasks and timer jobs) and server-level automation.
4.6.2 Maintaining CI/CD pipelines, build and deployment workflows, release management and environment promotion across development, test and production farms.
4.7 Cloud and Containerization
4.7.1 Setting up and configuring cloud platforms to provide hosting, storage, processing and webapplication services.
4.7.2 Deploying and configuring container orchestration platforms and the internal container registry, hosting custom APIs, microservices and supporting components.
4.8 Cross-Cutting
4.8.1 Coordinating with NCIA engineers on the setup, maintenance and 1st-, 2nd- and 3rd-level support for infrastructure, directory/domain, network and other platform teams.
4.8.2 Designing the solution architecture and high-availability design for the platforms.
4.8.3 Maintaining proactive monitoring, alerting and health-checking, planning capacity and scaling to meet evolving demand, and applying scheduled patching and updates.
JFCNP IKM - Statement of Work
10-09-2026 Page 5 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
4.8.4 Maintaining version and schema compatibility across farms, databases and deployed solutions, and integrating approved supporting software (e.g. reporting, business-analytics, documentconversion services).
4.8.5 Producing technical documentation, including topology maps, process maps and diagrams.
4.9 Incident Response
4.9.1 Performing fault diagnosis, remediation and root-cause analysis across applications, databases, web applications, messaging, interfaces, infrastructure and servers, and implementing corrective measures to prevent recurrence.
5. SCHEDULE OF DELIVERY / SPRINTS PLANNING, EXECUTION AND REVIEW
The services are delivered in weekly sprints. The content of each sprint and the associated performance criteria are agreed in writing between the COTR and the contractor personnel at sprint planning, based on the tasking activities set out in this SOW.
5.1 Sprint Planning
• At the beginning of each sprint, the contractor personnel and the COTR will meet to set the objectives
for the upcoming sprint.
• Define clear, achievable sprint goals, with specific delivery targets, quality standards and Key
Performance Indicators (KPIs) for each task.
• Agree the required level of effort for the sprint tasks and confirm the contractor personnel's availability.
• Review and prioritize the backlog of tasks, issues and improvements from previous sprints.
5.2 Sprint Execution
• The contractor personnel executes the agreed sprint plan, tracking the status of deliveries and issues
in a shared dashboard or log determined by the COTR.
• Progress is reviewed through regular touchpoints, at intervals set by the COTR, where issues are
addressed and adjustments agreed.
• The contractor personnel maintains the agreed quality standards throughout the sprint; the COTR
performs the quality control of the deliverables and provides feedback in writing.
5.3 Sprint Review
• At the end-of-sprint meeting outcomes are reviewed against the performance criteria agreed at
planning (sprint goals, quality standards and KPIs).
• Actions to address open issues and improve the next sprint are defined and carried into the backlog.
• The review meeting of a completed sprint and the kick-off meeting of the following sprint may be held
in a single session.
6. ACCEPTANCE CRITERIA AND PAYMENT MILESTONES
6.1 Acceptance
• A sprint is accepted when the contractor personnel has worked the full HQ working week and
submitted the sprint completion report.
• Each month, the COTR and the contractor personnel sign a Sprint Evaluation Sheet (SES) (Annex
A) listing the sprints completed in that month.
6.2 Payment Milestones
• Payment is made monthly for the sprints listed in the signed SES. A sprint spanning two months is
invoiced in the month in which it ends.
JFCNP IKM - Statement of Work
10-09-2026 Page 6 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
• Invoices shall be accompanied by the signed SES.
• JFCNP may exercise options for additional sprints based on the same deliverables, depending on
project priorities.
7. CONTRACTOR PERFORMANCE REQUIREMENTS AND REPORTING
7.1 HQ Representatives
The contractor personnel shall report to the COTR.
The COTR administers the technical aspects of the SOW, including agreeing the content and scope of each sprint, monitoring progress, performing final quality control, accepting completed sprints through the Sprint Evaluation Sheet (SES) and approving any travel.
The administrative and financial aspects of the contract, including invoicing and payment, are administered by JFCNP Purchasing and Contracting.
Sprint Evaluation Sheet (SES): Completed monthly by the COTR and the contractor personnel, it records the sprints completed in the month and their performance evaluation. Sprint assessments are consolidated by the COTR into cumulative performance conclusions over the course of sprints.
Sprint Completion Report: Provided in email format, by the contractor personnel to the COTR, within three days after completion of the sprint, detailing the activities performed against the agreed task list; tasks shall be traceable to task-logs.
7.2 Problem and Deficiency Reporting
The contractor personnel shall report any issue, risk or deficiency affecting the delivery of the services to the COTR without delay.
8. PERSONNEL REQUIRED FOR STATEMENT OF WORK
8.1 Position
The service depicted in this SOW is for ONE (1) contractor personnel position: Data Infrastructure Engineer - DevOps.
The contractor personnel shall meet the qualifications set out below.
8.2 Replacement of Personnel
If the selected Contractor Personnel is unable to continue the delivery of the services, or the Contractor is no longer able to provide the selected Contractor Personnel, the Contractor shall propose a replacement without interruption of service. The replacement Contractor Personnel shall be assessed against the same qualification criteria set out in this SOW.
8.3 Qualifications
The consultancy support for this work requires the following qualifications:
8.3.1 Education and Experience
• At minimum, a Bachelor’s degree in a related field.
• At least 5 years of experience, supported by relevant certification, in the technical areas listed below.
8.3.2 Technical Qualifications
MS SharePoint Farm Setup and Administration - experienced in Central Administration, the MS Windows Server web-application tier (IIS), multiple and federated farm topologies, high availability and redundancy, farm-level services such as Search, Office Online Server (WOPI) and workflow engines, and in maintaining current server and operating-system technologies.
JFCNP IKM - Statement of Work
10-09-2026 Page 7 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
Database Setup and Administration - experienced in administering MS SQL Server content and configuration databases, including performance tuning, capacity and storage management, and highavailability clustering (e.g. Always-On, SQL Cluster).
Access Management - experienced in Active Directory, Kerberos, claims-based authentication, ADFS, conditional access, Single Sign-On (SSO), certificate services and PKI, and role-based access.
SharePoint User Profile Services - experienced in the User Profile Service Application and in profile synchronization with Active Directory and other identity sources (AD, LDAP, etc.).
Messaging and Communication Services Integration - experienced in integrating messaging and collaboration services (e.g. MS Exchange, Skype for Business) with SharePoint, including messagingdriven workflow automation.
Virtualization and Failover Clustering - experienced in virtualization platforms (e.g. MS Hyper-V, VMware) and infrastructure failover clusters.
Automation, Scripting and DevOps - experienced in PowerShell automation, scripting and development in additional languages (e.g. Python, C++), scheduled and automated jobs across the platforms, configuration-management tools (e.g. PowerShell DSC, Group Policy), source control and build automation (e.g. Git, Azure DevOps Server), and CI/CD pipelines including release management and environment promotion.
Cloud and Containerization - experienced in cloud platforms (e.g. Microsoft Azure, AWS) providing hosting, storage, processing, web-application and related services, and in container deployment and orchestration (e.g. Docker and Kubernetes, or equivalent).
Network Services - experienced in networking concepts such as load-balancing, web application firewalls, segmentation, IP configuration and DNS, and in storage and infrastructure hardware and web portal technologies.
Relevant certifications and/or coursework supporting the above include:
• Virtualization and Cloud Training/Certifications (e.g. VMware)
• Microsoft Azure administration Training/Certification
• Server and security Training/Certifications
8.3.3 Professional Qualifications
• Excellent spoken and written English communication, presentation and briefing skills.
• Proactive in identifying issues and improvement opportunities, acting on them without prompting.
• Strong multi-tasking skills, managing multiple concurrent tasks and shifting priorities in parallel.
• Structured and analytical approach to problem diagnosis and resolution.
• Knowledge of NATO environment, working practices, structure and organization.
9. TIME REQUIREMENTS FOR CONTRACTOR PERSONNEL
9.1 Sprint Length
One sprint corresponds to one week of HQ working hours. Typically, one sprint will correspond to a 38- hour work week.
9.2 HQ Daily Working Hours
• The normal working hours of the HQ are Monday to Thursday 0800-1700 and Friday 0800-1500,
following the JFCNP HQ calendar.
• The HQ working days and hours may vary. When the HQ shifts to a 7-day work week and/or extended
hours (e.g. 07h00-19h00 or 08h00-20h00), the sprint will accordingly extend to span the official
working days and hours of the HQ for that week.
JFCNP IKM - Statement of Work
10-09-2026 Page 8 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
• On occasion, the contractor personnel may be required to provide the services outside the HQ regular
working hours, on weekends, or to be available on-call.
10.PROOF OF PAST PERFORMANCE
The Contractor shall submit the following with its quotation as proof that the proposed contractor personnel meet the qualifications required for the position:
• Copies of academic credentials, diplomas, transcripts and educational certificates of the proposed
contractor personnel;
• Curriculum Vitae (CV) / resume of the proposed contractor personnel;
• Evidence of a minimum of 5 years of experience in the required technical areas;
• Proof of a valid personal NATO Security Clearance (at least NS).
11.PLACE OF PERFORMANCE
The contractor personnel is requested to regularly work on-site at JFCNP HQ, Lago Patria, ITALY. Under exceptional circumstances, remote work may be agreed on a case-by-case basis.
12.REQUIRED TRAVEL
There may be requirements to travel to other sites for completing these tasks. Any travel is subject to prior approval by the COTR.
Travel will be the responsibility of the Contractor and the expenses will be invoiced separately to JFCNP within the limits of the NATO and JFCNP Travel Directives, in accordance with the terms and conditions of the framework agreement.
13.FURNISHED MATERIALS AND SERVICES
Office space, supplies, infrastructure and IT/CIS equipment required for the delivery of the services under this SOW, will be provided by JFCNP.
14.SECURITY CLEARANCE
The Contractor shall ensure that all personnel requiring recurring access to on-site locations for the delivery of the services under this SOW hold a valid Personal Security Clearance at NS level.
15.CONSTRAINTS
15.1 Documentation Standards
All documentation provided under this SOW will be based on JFCNP templates or as agreed with the COTR.
15.2 Storage of Materials
All scripts, documentation, code and other work products will be stored solely within JFCNP-authorized areas.
15.3 Approved Software, Hardware and Tools
Only NATO-approved software, hardware and services may be used in the delivery of the services under this SOW.
15.4 Intellectual Property Rights
All intellectual property rights in any work products generated under this SOW, including scripts, source code, pipelines, configurations, designs, topologies, documentation, reports and any other materials
JFCNP IKM - Statement of Work
10-09-2026 Page 9 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
produced in the performance of the services (Foreground IPR), shall vest solely and unconditionally in JFCNP NATO from the moment of their creation.
The Contractor shall make no claim and place no restriction on NATO’s rights in the Foreground IPR, and shall ensure that suitable arrangements are in place with its personnel to give full effect to this provision.
The Contractor and its personnel may use the work products, and any materials or information made available to them under this SOW, solely for the performance of the services; they shall not use, reproduce, retain or disclose them for any other purpose, during or after the period of performance, without the prior written consent of the Purchaser.
JFCNP is automatically granted a non-exclusive, irrevocable, worldwide, royalty-free license to use, maintain, modify and further develop any work performed or produced by the Contractor under this SOW.
JFCNP IKM - Statement of Work
10-09-2026 Page 10 of 10
NATO UNCLASSIFIED
NATO UNCLASSIFIED
ANNEX A
SPRINT EVALUATION SHEET (SES)
CPA NUMBER:
DO NUMBER:
TITLE:
COTR:
CONTRACTOR PERSONNEL:
SPRINT EVALUATION CERTIFICATION
I hereby certify that the sprints described below have been completed, and the performance of the contractor personnel evaluated, in accordance with the applicable Statement of Work (SOW).
The sprints referenced below have been reviewed and recorded.
| Sprint Number | Period | Progress / Achievements | Comments |
| Contractor Personnel:Name:Signature:Date: | Contractor Representative:Name:Signature:Date: |
NATO UNCLASSIFIED
NATO UNCLASSIFIED
RFQ-JFCNP-26-15
10 September 2026
| HEADQUARTERS ALLIED JOINT FORCE COMMAND NAPLESQUARTIER GENERAL DU COMMANDEMENT INTERALLIE DEFORCES INTERARMEES NAPLESVia Madonna del Pantano, 80014 Giugliano in Campania, Loc.Lago Patria, Naples, Italy |
| PART IVPRICE PROPOSAL |
Operational Service Support for JFCNP IKM DevOps - Data Infrastructure Engineer
The Price Bid shall be submitted on following Price Proposal format.
a. Bidders may expand on the basic breakdown by adding sub-items as deemed necessary.
However, the basic presentation must not change;
b. Bidders must note that partial bidding is not authorized;
c. Prices shall be quoted in EURO using two decimal numbers.
Base Year
| SERVICE | SPRINT (WEEKLY) PRICE | MONTHLY PRICE | TOTAL AMOUNT |
| Engineering Support Services requested as per Bid RFQ-JFCNP-26-15, Part III, Statement of Work | € | € | € |
| SERVICE | SPRINT (WEEKLY) PRICE | MONTHLY PRICE | TOTAL AMOUNT |
| Engineering Support Services requested as per Bid RFQ-JFCNP-26-15, Part III, Statement of Work | € | € | € |
| SERVICE | SPRINT (WEEKLY) PRICE | MONTHLY PRICE | TOTAL AMOUNT |
| Engineering Support Services requested as per Bid RFQ-JFCNP-26-15, Part III, Statement of Work | € | € | € |
| Engineering Support Services requested as per Bid RFQ-JFCNP-26-15, Part III, Statement of Work | € |
Apply for this role
Hi I'm Rebecca.
I manage this role
If you would like to know more about this role or similar jobs, please get in contact with me.
Recommend.
this role to a friend
Is this role revelant to any one you know?
Share it with them now.
